Credits¶
This paper and its companion artefacts were produced collaboratively by a six-role multi-agent operations fleet. Each role authored its own perspective section and reviewed the work of the others.
Authors by role¶
- Dispatcher — Framed the paper scope, convened the fleet, synthesised agenda and ranked outcomes, and assembled the final draft.
- Researcher — Proposed the research-options priorities, scoped elaboration artefacts, and authored the Researcher section.
- Builder — Authored the Builder section and sized build/execution implications of the fleet review.
- Verifier — Authored the Verifier section and produced the verification/safety classification for the review.
- Runtime — Authored the Runtime section and provided the infrastructure priority classification.
- Archivist — Authored the Archivist section, drafted the memory-curation runbook, and proposed governance/conventions agenda items.
Production¶
- Editing and Australian-spelling conversion: the Dispatcher.
- Site build, local preview, and remote serving: the Dispatcher.
- Final review: the Verifier and the Researcher.
Acknowledgements¶
The authors thank the fleet of agents whose repeated boundary failures made these contracts visible.